Skip to product information
1 of 3

Isonas

ISONAS RC-04-PRX-M Pure IP Reader Controller Mullion, 125kHz with Bluetooth

ISONAS RC-04-PRX-M Pure IP Reader Controller Mullion, 125kHz with Bluetooth

Regular price $1,257.99 USD
Regular price $1,257.99 USD Sale price $1,257.99 USD
Sale Sold out
Tax included. Shipping calculated at checkout.
  • Proximity technology supports 125 kHz
  • Mullion mounting form factor
  • Bluetooth Low Energy (BLE) allows customers to utilize our Pure Mobile application and use their smart phone as their credential
  • Local mode feature allows readers to function without a connection to the network for faster user response times, less network traffic and reduced host system loading.
  • Tamper detection via accelerometer senses any type of altering and prevents a security breach with the reader
  • Metal back plate provides additional security, a simple two-piece installation and consistent read range
  • Metal back plate provides additional security, a simple two piece installation and consistent read range.
General Information

Power Options

  • Power over Ethernet (PoE), (IEEE 802.3af, Class 0)
  • DC power: 12 VDC In (9 to 16 V; please note: 24 VDC is not approved for this device)

Reader-Controller Intelligence Capacity

  • 64,000 credentials
  • 5,000 events
  • 32 time schedules

Network Communications

  • 10Mb, half or full duplex
  • Ethernet, TCP/IP, standard RJ45 cable
  • Network host or client modes supported
  • DHCP addressing supported
  • Field flashable microcode

Environmental

  • Operating temperatures -40 ºF to 135 º F (-40 ºC to 57 ºC)
  • Conformal coated for weather resistance
  • Exposure ratings: IP56

Outputs

  • 8 wire pigtail
  • 600mA provided to power the lock
  • Conditioned lock power
  • Fail safe and fail secure supported
  • Two exterior door kit outputs

Inputs
Two configurable inputs: 

  • Door sense
  • General purpose Request to Exit (REX) or Auxiliary (AUX)

Visual Indicator

  • LED signal for reader status
  • Backlit keypad

Security Features

  • Tamper detection via an accelerometer
Documents

Datasheet

Manufacturer Brochure

View full details